The instruction
We were asked to specify a non-combustible replacement for cedar cladding on the front and side elevations of a block of flats, with reduced maintenance requirements.
The requirements
The proposal needed to address external fire spread, consider the existing appearance for planning purposes and improve the weatherproofing around windows where water ingress had occurred.
The work
We prepared the specification and liaised with cladding and cavity-barrier manufacturers about the proposed materials and construction details.
The specification included weatherproofing details around openings. We also prepared and submitted a planning application for the change of material.
The specification
The client received a coordinated specification for tender, covering the replacement cladding, cavity barriers and weatherproofing details. The proposed design addressed the identified fire safety and water ingress concerns.